Maintenance updates – T53A/B and55 heating Mon 26 May / T55 partly blocking of outdoor area / Downtime heating system TM55 from Fri 13. June

[Our translation/Google translate]

Work on heating system water supply at Thormøhlens gate 55 and 53 A/B Monday 26. June

Hello

Eviny will be doing major work on the district heating supply to Thormøhlensgate. 55 and T53 A/B this Monday 26.05.2025 from 09.00 to 21.00 in the evening.

This means the following for us:

Thormøhlensgt. 55 Bio block loses hot tap water (spring water)

Thormøhlensgt. 53 A/B loses heat (colder building) and hot tap water (spring water)

If you have any questions about this, contact operations at 55589393

Information about crane work at Thormøhlens gate 55

Due to ongoing construction work in T55, the area towards the light rail/rig area will be blocked due to the placement of a mobile crane and the lifting of equipment onto the roof of the building in week 23.

See attached map with markings of the area. Please plan your activities accordingly.

Downtime heating system

The University of Bergen’s district heating network at Nygårdshøyden south currently supplies several of the university’s buildings with water-based heat. This heat comes from an energy center at Allègaten 41, Realfagbygget. UiB is now undergoing a major renovation of the energy center where heat pumps will be installed to help cover a large portion of the energy needs of Nygårdshøyden south by drawing energy from the seawater supply to UiB.
To achieve this, a comprehensive restructuring of the infrastructure in the energy center is required, which will result in downtime for the heating system in the following buildings:

Thormøhlens gate 55/55A:

  • Start: Friday 13.06 at 13:00
  • Duration: 4-7 days